Brief
The asbestos removal project at the Nottinghamshire hospital demonstrated the importance of proper planning, preparation, and execution in the safe removal of ACMs (Asbestos Containing Materials).
The hospital administration's decision to hire ICEASBESTOS ensured the project was managed safely, effectively, and within the required timeframe of 7 weeks from the 7th December to 6th January 2023. The AIB removal period started on the 20th December 2022 until the 26th February 2023.
The brief was:
- Removing Door
- Plaster Board Wall
- Skirting Board
- Fittings
- Toilet and Sink
- Suspended Ceilings Air Duct
- Pipe Works
Asbestos Removal;
- Wall
- Columns
- Door Frame
- Blind Boxing Above Windows
- Riser Panels
Solution / Action Taken
The successful outcome of the project resulted in a satisfied client who was pleased with the work done.
In fact, the client was so impressed with the team's work that they offered a second ward to be done later on in the year. This feedback reinforces the professionalism and high standards that the asbestos removal company demonstrated throughout the project